Governor Phil Bredesen recently released a final list of projects to be funded with American Recovery and Reinvestment Act funds (Recovery Act), proposed bridge bonds and TDOT’s regular funding mechanisms. The three-tiered program represents more than 450 projects statewide touching every county in Tennessee. Included in the proposal, which has been presented to the Legislature, are 78 highway and bridge projects in TDOT’s Region Two alone.
The Recovery Act is fundamentally about creating and retaining jobs during one of the toughest economic times our nation and state have faced since the Great Depression,” said Governor Bredesen. “This three-tiered program represents a record investment in Tennessee’s transportation system. The Recovery Act, along with the bridge bonding and TDOT’s regular program, will put thousands of Tennesseans to work rebuilding and strengthening one of Tennessee’s largest economic drivers, our transportation system.”
TDOT’s Region Two includes Bledsoe, Bradley, Cannon, Clay, Coffee, Cumberland, DeKalb, Fentress, Franklin, Grundy, Hamilton, Jackson, Marion, McMinn, Meigs, Overton, Pickett, Polk, Putnam, Rhea, Sequatchie, Van Buren, Warren and White counties.
“Not only will these transportation projects help create or save tens of thousands of jobs for Tennesseans, the end result of this investment will be a more reliable transportation system,” said TDOT Commissioner Gerald Nicely. “This three-tiered program represents a responsible, balanced and community based approach to transportation. Years of planning and study have gone into each of the projects funded for construction.”
39 projects in TDOT’s Region Two will be funded through the American Recovery and Reinvestment Act including a project to reconstruct State Route One/US70-S in Warren County between Centertown and Spring Valley Road which has received strong support from state and local leaders. Tennessee received $572 million in Recovery Act funds. $85.8 million was distributed directly to the state’s eleven Metropolitan Planning Organizations and the City of Murfreesboro leaving $486.2 million for distribution by TDOT.
Another 21 bridge repair or replacement projects in Region Two are funded through bridge bonds and 18 are funded through TDOT’s traditional Three-Year Multimodal Work Program.
The Legislature is currently considering the transportation budget for approval. TDOT will let to contract all Recovery Act projects in May and June of 2009.
A complete listing of all projects identified for funding is attached to this release and is posted on the TDOT web site, http://www.tn.gov/tdot" www.tn.gov/tdot.
For more information on Tennessee’s transportation portion of American Recovery and Reinvestment Act visit http://www.tn.gov/tdot/recovery" www.tn.gov/tdot/recovery.
TDOT proposed comprehensive multimodal program FY 2010-2012
U.S. 70 over Daddy's Creek replace the bridge FY10
Hwy. 127 N of Winningham Rd. to Hwy. 68 Resurfacing
Hwy. 127 S of Hwy. 68 to Cleveland St. Construction
Peavine Rd., Firetower Rd. to East of Lakeview Dr. (RW)
Peavine Rd., East of Lakeview Dr. to East of Westcheste Dr./Catoosa Blvd. in FG ROW
Lantana Rd. Dunbar Rd. to SR 392
Area News
Governor identifies 78 transportation projects in TDOT’s region two for funding
- Area News
-
-
CCHS names Top Ten for Class of 2012
Abigayle Marie Claflin has earned the top spot in the Cumberland County High School Class of 2012, followed by Taylor Nicole Vaden as the class salutatorian.
-
Health reform law saves $2.1 billion for 3.6 million Americans with Medicare
Nearly 3.6 million people with Medicare saved $2.1 billion on their prescription drugs in 2011 thanks to the Affordable Care Act according to data issued today by the Department of Health and Human Services (HHS). Savings for people with Medicare will increase over time.
-
BOE ready to present vision to community
After months of work, the Cumberland County Board of Education approved a revised mission statement, belief statements and vision statements in January and is ready to start presenting the document to the community.
-
Suspect in road rage incident sought
Crossville Police have a getaway vehicle description, a possible tag number and even a suspect's name, but so far have not been able to apprehend the man wanted in connection with a road rage incident that occurred last Tuesday.
-
Water off at Renegade in spite of court order
In spite of a Chancery Court order, at least 84 condominium units and two homes on Renegade Mountain remained without water Monday after the water supply was turned off last Wednesday night.
-
Man facing 20 charges sentenced to seven years
A Cumberland County man who went on a crime spree of burglaries and thefts — racking up 20 charges in the process — entered guilty pleas to several charges in Criminal Court and received a total of seven years in prison.
- Looking Back
-
Schools say thanks to principals Feb. 10
Cumberland County Schools will recognize principals and administrative staff Feb. 10 following a resolution of appreciation by the Cumberland County Board of Education.
-
Phoenix School to get classroom, shop area
The former maintenance facility at the Phoenix School will become a classroom and shop facility for an expanded Career and Technical Education program at the alternative school.
-
Moving dirt
- More Area News Headlines
-





